How to Use the Project ROI Calculator: Steps and a Worked Example

By 2 min read

Calculate a project’s return on investment and payback period from its cost and the yearly benefit it delivers. This guide shows what to enter, a worked example with real numbers, and the limits to keep in mind. The Project ROI Calculator tool is free, needs no account and runs in your browser.

What you need

  • Total project cost, for example 80000
  • Annual benefit (savings or extra profit), for example 35000
  • Years the benefit lasts, for example 4

Step by step

  1. Open the Project ROI Calculator tool.
  2. Fill in Total project cost.
  3. Fill in Annual benefit (savings or extra profit).
  4. Fill in Years the benefit lasts.
  5. Read the result, which updates as soon as the inputs change.

Worked example

With these inputs:

  • Total project cost: 80000
  • Annual benefit (savings or extra profit): 35000
  • Years the benefit lasts: 4

the tool returns:

Project ROI: 75%
Total benefit: 140,000
Net benefit: 60,000
Payback period: 2.29 years

A second example

Changing Total project cost 80000 to 160000 gives:

Project ROI: -12.5%
Total benefit: 140,000
Net benefit: -20,000
Payback period: 4.57 years

Comparing two runs like this is a quick way to see how much each input moves the result.

How it works

The calculation is: Project ROI = (annual benefit × years − project cost) ÷ project cost × 100. Payback period = project cost ÷ annual benefit. Enter the full project cost, the savings or extra profit it brings each year, and how many years that benefit lasts. The result shows ROI over that lifetime and how long until the project pays for itself.

Things to keep in mind

Money later is worth less than money now, and this simple ROI does not discount future benefits. For long projects, compare net present value as well.

If this is not quite what you need, try ROI Calculator, SaaS ROI Calculator or Present Value Calculator.

More from the blog