How to Use the Project Progress Percentage Calculator: Steps and a Worked Example
Track project progress as a percentage of planned work. This guide shows what to enter, a worked example with real numbers, and the limits to keep in mind. The Project Progress Percentage Calculator tool is free, needs no account and runs in your browser.
What you need
- Work completed (tasks, hours or points), for example 45
- Total planned work, for example 120
Step by step
- Open the Project Progress Percentage Calculator tool.
- Fill in Work completed (tasks, hours or points).
- Fill in Total planned work.
- Read the result, which updates as soon as the inputs change.
Worked example
With these inputs:
- Work completed (tasks, hours or points): 45
- Total planned work: 120
the tool returns:
Completion rate: 37.5%
A second example
Changing Work completed (tasks, hours or points) 45 to 90 gives:
Completion rate: 75%
Comparing two runs like this is a quick way to see how much each input moves the result.
How it works
The calculation is: Progress = work completed ÷ total planned work × 100. Enter the work completed and total planned work and the result appears straight away. Everything runs in your browser, so nothing you type is uploaded.
Things to keep in mind
Check your inputs, units and any local rules before you rely on the result.