How to Use the Project Profitability Calculator: Steps and a Worked Example

By 1 min read

Calculate a project’s profit after direct costs and allocated overheads. This guide shows what to enter, a worked example with real numbers, and the limits to keep in mind. The Project Profitability Calculator tool is free, needs no account and runs in your browser.

What you need

  • Project revenue, for example 50000
  • Direct costs (labor, materials), for example 30000
  • Overheads allocated to the project, for example 5000

Step by step

  1. Open the Project Profitability Calculator tool.
  2. Fill in Project revenue.
  3. Fill in Direct costs (labor, materials).
  4. Fill in Overheads allocated to the project.
  5. Read the result, which updates as soon as the inputs change.

Worked example

With these inputs:

  • Project revenue: 50000
  • Direct costs (labor, materials): 30000
  • Overheads allocated to the project: 5000

the tool returns:

Project profit: 15,000

A second example

Changing Project revenue 50000 to 100000 gives:

Project profit: 65,000

Comparing two runs like this is a quick way to see how much each input moves the result.

How it works

The calculation is: Project profit = revenue − direct costs − allocated overheads. Enter the project revenue, direct costs and overheads allocated to the project and the result appears straight away. Everything runs in your browser, so nothing you type is uploaded.

Things to keep in mind

Check your inputs, units and any local rules before you rely on the result.

If this is not quite what you need, try Project ROI Calculator, Project Conversion Rate Calculator or Project Cost Estimator.

More from the blog