How to Use the Project Cost Estimator: Steps and a Worked Example

By 1 min read

Estimate a project’s labor cost from hours and an hourly rate. This guide shows what to enter, a worked example with real numbers, and the limits to keep in mind. The Project Cost Estimator tool is free, needs no account and runs in your browser.

What you need

  • Estimated hours, for example 80
  • Hourly rate, for example 60

Step by step

  1. Open the Project Cost Estimator tool.
  2. Fill in Estimated hours.
  3. Fill in Hourly rate.
  4. Read the result, which updates as soon as the inputs change.

Worked example

With these inputs:

  • Estimated hours: 80
  • Hourly rate: 60

the tool returns:

Estimated billable amount: 4,800

A second example

Changing Estimated hours 80 to 160 gives:

Estimated billable amount: 9,600

Comparing two runs like this is a quick way to see how much each input moves the result.

How it works

The calculation is: Project cost = hours × hourly rate. Enter the estimated hours and hourly rate and the result appears straight away. Everything runs in your browser, so nothing you type is uploaded.

Things to keep in mind

Check your inputs, units and any local rules before you rely on the result.

If this is not quite what you need, try Project Duration Estimator, Meeting Cost Calculator or Project Progress Percentage Calculator.

More from the blog